500 m³ of wastewater treated per day at Industrias Ales

Together with CWT we designed, supplied and integrated the wastewater treatment plant of an edible fats and oils manufacturer: screening, equalization, GEM flotation, MBBR reactor, disinfection and sludge dewatering.

  • ClientIndustrias Ales C.A.
  • Year2017
  • IndustryEdible fats and oils
  • ScopeIntegrated solution with CWT

GEM flotationAdvanced primary treatment

An effluent with fats, oils and a high organic load

The effluent from edible fats and oils production had to be treated to meet environmental discharge regulations, in a compact plant with its own sludge handling.

  • Fats and oilsThey had to be separated before reaching biological treatment.
  • High organic loadA BOD of 1,850 mg/L requires robust biological treatment.
  • Space and sludgeA small available footprint and sludge that had to be dewatered for disposal.
  • 500 m³/daydesign flow
  • 132.5 m³MBBR biological reactor
  • 89.2 %BOD removal
  • 1.9 m³/daydewatered sludge

Treatment train: from effluent to discharge

Six stages grouped into three steps: condition the water, separate the fats and degrade the organic matter, and disinfect while the sludge is dewatered.

  1. Process effluent
  2. 1Screening and equalization
  3. 2GEM flotation and MBBR
  4. 3Disinfection and sludge
  5. Discharge

1

Screening and equalization

A screen retains coarse solids and the equalization tank stabilizes flow and pH.

  • Self-cleaning rotary screen, 0.5 mm
  • Equalization tank of 45 m³ or more
  • D-Loop recirculation with pH control

2

GEM flotation and MBBR reactor

Flotation separates fats and solids with dissolved air; the biological reactor degrades the organic matter.

  • 6 LSGM mixing heads with coagulant
  • MBBR reactor of 132.5 m³ with 50% media fill
  • Secondary clarifier

3

Disinfection and sludge

Chlorination in a baffled tank and mechanical dewatering of all the sludge.

  • Contact tank of 14 m³ with 60 min retention
  • Multi-disc screw dewaterer
  • Sludge from 9.9 to 1.9 m³/day after dewatering

Automation and control

  • Container with control room and laboratory
  • Closed-loop pH control
  • Automated blowers
  • Progressive cavity pumps for sludge
  • Automatic chemical dosing
  • Centralized power and control panels

An integrated solution together with CWT

Sanitron and CWT (Clean Water Technology) designed, supplied and integrated the complete treatment train.

What Sanitron and CWT did

  1. EngineeringConceptual and detailed engineering and electromechanical design of the complete train.
  2. Equipment supplyGEM system, MBBR media, blowers, dosing pumps, clarifier and disc filter.
  3. FabricationModular carbon steel tanks and a container equipped for plant control.
  4. Supervision and start-upInstallation supervision, hydrostatic tests and commissioning.

Results

  • Reduced pollutant loadRemoval of 93% of suspended solids, 90% of nitrogen, 89.2% of BOD and 78.9% of COD.
  • Compact, continuous plantGEM flotation and the MBBR reactor, both high-rate, take up little space.
  • Sludge under controlMechanical dewatering reduces sludge volume and makes safe final disposal easier.

Does your plant need to treat its wastewater?

We design compact, high-efficiency plants for effluents with fats, oils and high organic load, with sludge handling included.

Contact us

Office in EcuadorDe los Eucaliptos E8-70 y calle E9, Quito 170307

Phone+593 99 871 1330
+593 2 280 8126

Emailinfo@sanitronec.com

Office hoursMonday to Friday
9:00 a.m.–12:00 p.m. and 1:00–6:00 p.m.

Office in the United States9995 NW 9th St. Circle, Suite 3, Miami, FL 33172
+1 786 972 2008